Product Image

Water Temperature Sensor for Alfano 6, PRO III 3 EVO, ADM, ADL Long Lead Temp

£43.50

Long Water Temperature Sensor Cable for Alfano 6, PRO III 3 EVO, ADM, ADL Data Loggers. 140 cm Water Temperature Sensor for Alfano 6, PRO III 3 EVO, ADM, ADL. We make custom length sensors.

The Water Temperature Sensor for Alfano 6, PRO III 3 EVO, ADM, ADL Long Lead Temp is suitable for applications requiring accurate temperature measurement in water-based systems.

Product Reviews

Name: Review: