Site Logo
My Account | Wishlist | Basket
All Categories
For Men

Razors & Razor Blades

See More
Alfano
For Men - Razors & Razor Blades

  1. Home
  2. For Men
  3. Razors & Razor Blades
Product Image

Alfano NTC Cylinder Head Temp Sensor For Alfano 6 / Pro III Evo / ADM Lap Timer - Fits 14mm Spark Plug 180cm Long Lead

£72

A range of NTC type under plug cylinder head temperature sensors suitable for use with Alfano 6 2T, Alfano 6 1T, Pro III Evo and ADM lap timers.Max temperature - 285 degrees C (545 degrees F)Optional extension lead available to buy separately

Product Reviews

Name: Review:

Related Products

Alfano NTC Under Plug Cylinder Head Temperature Sensor - Fits 14mm Spark Plug 45cm Long Lead

Alfano NTC Under Plug Cylinder Head Temperature Sensor - Fits 14mm Spark Plug 45cm Long Lead

£73.20

Alfano K Type Karting Cylinder Head Temp Sensor Fits Alfano 6 / Pro III Evo

Alfano K Type Karting Cylinder Head Temp Sensor Fits Alfano 6 / Pro III Evo

£70.80

Water Temperature Sensor for Alfano 6, PRO III 3 EVO, ADM, ADL Long Lead Temp

Water Temperature Sensor for Alfano 6, PRO III 3 EVO, ADM, ADL Long Lead Temp

£43.50

XINHAITC Head Shaver Replacement Heads,General Purpose 6D Head for Electribrite Replacement Head Accessories,Bald Shaver Replacement Head, Replacement Shaver Head, Shaver Heads

XINHAITC Head Shaver Replacement Heads,General Purpose 6D Head for Electribrite Replacement Head Accessories,Bald Shaver Replacement Head, Replacement Shaver Head, Shaver Heads

£9.97

Lvpradior head shaver, Shaver Replacement Heads, 8D Blade Replacement Heads, Universal Replacement Blade Head Shaver for Men, Electric Razor Shaver Head Replacement for Head and Face (8 Head)

Lvpradior head shaver, Shaver Replacement Heads, 8D Blade Replacement Heads, Universal Replacement Blade Head Shaver for Men, Electric Razor Shaver Head Replacement for Head and Face (8 Head)

£11.99

Lvpradior head shaver, Shaver Replacement Heads, 8D Blade Replacement Heads, Universal Replacement Blade Head Shaver for Men, Electric Razor Shaver Head Replacement for Head and Face (7 Head)

Lvpradior head shaver, Shaver Replacement Heads, 8D Blade Replacement Heads, Universal Replacement Blade Head Shaver for Men, Electric Razor Shaver Head Replacement for Head and Face (7 Head)

£11.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyShavers.co.uk 2026